Challenges in “Procurement” for Successful Building Construction Projects
The process of obtaining and managing services and resources to successfully complete a building construction project is known as “Procurement.”
In other words, it is the process of “Finding, Buying, and Delivering the Products” and services required to execute a civil engineering project. It involves identifying, selecting, and purchasing the necessary materials, equipment, subcontractors, and services to carry out the construction work.
Key Challenges for a Construction Contractor in Procurement
1. Limited Suppliers in The Market
Materials and services are the most important for the completion of a project and a good supplier is. who can provide us with effective cost and good quality service? From a vendor and only one supplier can get it done. Due to being a limited supplier to a builder, the cost has increased, and quality has to be reconciled.
2. Cost Instability
The cost of building construction materials and equipment costs is variable, affected by market conditions and supply-demand imbalances. These ups and downs affect the budget of the project and are happens for many reasons. It is difficult to control costs and maintain economic constancy.
· Materials Price
· Labor Cost
· Equipment And Machinery Costs
3. Quality Control
The quality control of the materials and services procured plays an important role in making a successful civil engineering project. Hence, it is Important to Make Sure That the Material is of Good Quality or not. Sometimes maintaining quality can be a challenge for a construction contractor, especially when dealing with multiple suppliers. A project manager should conduct checks and evaluations to ensure strong quality control over bought materials or the ones being got to satisfy the project requirements.
4. Supply Chain Disruption
Supplier chain disruption means unexpected barriers such as Natural Disasters, Labor Strikes, and events such as transportation disruptions. Due to this, there is a delay in the delivery of material and due to this the work going on the site gets hampered. This increase can come at any stage of the chain, which also comes from the manufacturer to the distributor not only a builder or material contractor.
There are many reasons for this:
1. Natural adversity
2. Out of stock
3. Transportation interruption
4. Dealer closure
5. Timely Delivery
Timely delivery means on-time delivery of materials and requirements is important in building construction projects. But to get the delivery buyer often faces problems from the supplier, there are various reasons why the buyer or builder has to face the challenges related to timely delivery of goods. Here are many reasons for the delay in delivery.
- Lack of Supplier Performance and Trustworthiness
- Lack of Proper Communication and Collaboration
Conclusion
Procurement-related challenges in building and construction projects and civil engineering work create a significant drag on the smooth execution of a project. These challenges are something like limited suppliers, cost instability, Quality Control, supply chain disruption, and timely delivery these are common challenges faced by builders, material contractors, and construction professionals.